Skip to main content
. 2016 Jan 22;82(3):822–831. doi: 10.1128/AEM.03103-15

TABLE 1.

Distribution of environmental samples across surface categories and production departments

Production department and parametera Result by surface category
Floor and drainage Operator Equipment Total
Ham production
    No. of samples 94 74 216 384
    No. of positives 9 7 9 25
    % prevalence (95% CI) 9.6 (5.1–17.2) 9.5 (4.7–18.3) 4.2 (2.2–7.7) 6.5 (4.4–9.4)
Deboning
    No. of samples 127 171 414 712
    No. of positives 30 20 22 72
    % prevalence (95% CI) 23.6 (17.1–31.7) 11.7 (7.7–17.4) 5.3 (3.5–7.9) 10.1 (8.1–12.5)
Slicing
    No. of samples 74 75 223 372
    No. of positives 4 3 4 11
    % prevalence (95% CI) 5.4 (2.1–1.31) 4.0 (1.4–11.1) 1.8 (0.7–4.5) 3.0 (1.7–5.2)
a

CI, confidence interval.