Skip to main content
. 2015 Aug 21;88(1054):20140736. doi: 10.1259/bjr.20140736

Table 3.

Mean (standard deviation) values for the dose–volume metrics of the four plan types

Plan types D2% (Gy) D98% (Gy) D50% (Gy) HI CI V33.2PTV (%) V35PTV (%) V32r (%) V28r (%) V18r (%) V32rw (%) V28rw (%) V18rw (%)
Hom-NoSpc 36.2 (0.2) 32.8 (0.2) 35.0 (0.1) 0.095 (0.007) 0.99 (0.01) 96.2 (0.9) 49.9 (3.8) 4.1 (1.7) 8.6 (3.1) 23.9 (7.8) 8.2 (3.5) 13.7 (5.1) 25.5 (7.6)
Hom-Spc 36.2 (0.2) 33.0 (0.1) 35.0 (0.0) 0.090 (0.007) 1.01 (0.02) 97.2 (0.5) 51.5 (2.7) 0.9 (1.2) 2.5 (2.8) 10.9 (6.7) 1.6 (2.4) 3.7 (4.0) 13.8 (6.7)
Het-NoSpc 39.1 (0.2) 33.2 (0.3) 37.5 (0.1) 0.155 (0.009) 1.12 (0.02) 98.1 (0.6) 87.4 (3.2) 4.6 (1.7) 9.0 (2.9) 23.9 (6.1) 9.5 (3.8) 14.7 (4.9) 26.3 (6.6)
Het-Spc 38.9 (0.2) 33.7 (0.4) 37.6 (0.1) 0.140 (0.013) 1.14 (0.03) 99.0 (0.6) 91.9 (2.7) 1.2 (1.6) 2.8 (3.0) 11.4 (6.9) 1.8 (2.5) 4.3 (4.4) 14.4 (6.7)

CI, V33.2Body/PTV, conformity index; Dn%, minimum dose to n% of the PTV structure; Het, plans with D2% ≤ 40.2 Gy; HI, (D98% − D2%)/D50%, homogeneity index; Hom, plans with D2% ≤ 37.5 Gy; NoSpc, plans computed on CT scanned before spacer insertion; PTV, planning target volume; Spc, plans computed on CT scanned after spacer insertion; VmPTV, percentage of PTV structure receiving ≥m (Gy); Vmr, percentage of rectal structure receiving ≥m (Gy); Vmrw, percentage of rectal-wall structure receiving ≥m (Gy).