Skip to main content
. 2016 Jan 1;33(1):53–64. doi: 10.1089/ees.2015.0337

FIG. 10.

FIG. 10.

Lead in water for 100% Pb conditions with connectors installed for duration of Phase C (N = 70 for each condition).