Skip to main content
. Author manuscript; available in PMC: 2017 May 1.
Published in final edited form as: J Stat Plan Inference. 2016 May 1;172:23–25. doi: 10.1016/j.jspi.2015.12.006

Table 3.

Simulation results when L = 2 (Bias: Empirical bias × 103; SE: empirical standard deviations × 103; ASEs: average of estimated standard deviation × 103 based on smooth bootstrap; CPs: empirical coverage probabilities of 95% confidence intervals × 102 based on smooth bootstrap).

σ n ϑ κ
ϑ τ
ϑ CC
Bias SE ASEs CPs Bias SE ASEs CPs Bias SE ASEs CPs
0.6 50 4 201 210 93.7 5 219 225 93.0 49 205 215 94.0
100 1 161 171 94.0 2 180 191 94.8 38 164 175 93.9
200 4 129 137 93.9 3 146 152 92.8 32 133 139 92.6
1.0 50 9 346 368 93.4 1 411 433 92.8 81 358 394 94.2
100 12 282 292 92.5 20 345 353 92.2 72 301 306 92.2
200 5 211 230 94.6 5 261 282 93.4 42 220 237 93.8