Skip to main content
. 2016 Mar 8;6:22860. doi: 10.1038/srep22860

Table 1. Details of the waterworks studied.

Waterworks Capacitya Treatment Process Additional Informationa
W-A 1.0 Million ton Influent (source) Raw Water From Taihu Lake
    Pre-Oxidation Ozonation: 0.6 mg/L
      Gas Water Ratio: 0.6–0.8: 1
      Contact Time: 10 minutes
    Biodegradation Biological Aerated Filter
      Working Depth = 2.0 m
      Gas Water Ratio: 0.6–0.8: 1
    Chlorination Residual Chlorine 0.05 mg/L
    Influent Pipeline length: 21 km
      Pipeline Retention Time: 6–7 h
    Coagulation and Aluminium Oxide: 30 mg/L
    Sedimentation Contact Time: 3–4 h
    Sand Filtration Quartz Sand: Pore Size 0.75 mm H = 70 cm
      Flow Rate: 5 ~ 6 m/h
    Ozonation Ozonation: 0.8 mg/L
      Contact Time: 10–15 min
    Activated Carbon filtration Granular Activated Carbon: d = 1.5 mm; H = 2.1 m, S = 0.5 × 0.5 m
    Membrane Filtration Polyvinylidene Fluoride(PVDF) Member: 0.45 μm
    Finished Water Residual Chlorine 0.8 mg/L
      Retention Time 3 h
W-B 0.5 Million ton Influent(source) Raw Water From Taihu Lake
    Coagulation and Aluminium Oxide: 50 mg/L
    Sedimentation Contact Time: 2 h
    Influent Pipeline length: 38 km
      Pipeline Retention Time: 12–15 h
    Sand Filtration Quartz Sand: Pore Size 0.75 mm H = 70 cm
      Flow Rate: 5 ~ 6 m/h
    Finished Water Residual Chlorine 0.4–0.6 mg/L
      Retention Time 2–3 h

adesign values.