Skip to main content
. 2016 Mar 14;11(3):e0150957. doi: 10.1371/journal.pone.0150957

Table 1. Fluence rates estimated based on the single reactor pass clearance of MS2 at 50 mL/min.

Description Number of Reactor Passes Reduction Equivalent Fluence (mJ/cm2)
Single reactor 1 97.7
Double reactor single pass 2 195
Double reactor double pass 4 390
Double reactor triple pass 6 585