Table 3.
Secondary outcome data
| Average time to theatre (days): CG/NCG | P-value | Length of hospital stay (days): CG/NCG | P-value | Complications | ||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Haematoma/Haemorrhage (n)a: CG/NCG | P-value | Cardiovasc cerebrovasc/TE (n): CG/NCG | P-value | Death within 30 days (n):CG/NCG | P-value | |||||
| Harty et al 2007 [68] | 7.2/2.1 | 0.03 | 7.4/3.1 | 0.02 | 6/6 | 0.003 | ||||
| Johansen et al 2008 [56] | 2.7/7.3 | 0/2 | ||||||||
| Sim and Gonski 2009 [57] CG vs NG |
3.5 (3.2)/0.9 (0.8) | <0.001 | 23.1 (17.7)/22.6 (21.4) | 0.92 | 1/1 | 1/2 | ||||
| Cox et al 2009 [58] | 25/30 | <0.05 | 2/0 | 2/1 | ||||||
| Nydick et al 2010 [53] | 1.88/1.68 | 0.64 | 0/0 | 1/1 | 0/1 | 0.35 | ||||
| Chechik et al 2011 [52] | 2.5 (1.5)/1.6 (0.96) | 0.003 | 1/1 | 6/1 | 0/0 | |||||
| Wallace et al 2012 [63] | ||||||||||
| Collinge et al 2012 [62] | 6.0 (3.4)/5.6 (4.0) | 0.61 | 0/10 | 0.89 | 0/9 | 0.95 | 3/39 | 0.23 | ||
| Chechik et al 2012 [59] | 1.7 (1)/7.5 (2.71) | <0.001 | 11.1 (4.8)/17.7 (7.2) | 0.0002 | 1/3 | 0.50 | 3/5 | 0.49 | 0/2 | 0.16 |
| Hossain et al 2013 [61] | 17.3 (13.3)/20.5 (16.6) | 0.28 | 3/1 | 0.36 | 0/0 | |||||
| Feely et al 2013 [54] | 1.1 (0.7)/1.3 (1.3) | 0.77 | 2/3 | 1.00 | 10/10 | 0.28 | 11/23 | 0.23 | ||
| Al Khudairy et al 2013 [60] | 4.2 (1)/8 (1) | <0.05 | 21.2 (11.9)/28.7 (16.4) | >0.05 | 0/0 | 0/2 | 2/4 | |||
| Wordsworth et al 2013 [55] | 1.2/1.2 | 0.91 | 0/2 | 1.00 | 2/74 | 0.71 | ||||
| Manaqibwala et al 2014 [64] | 2.3 (2.0)/1.9 (2.9) | 0.25 | 10.6 (5.6)/7.4 (7.6) | 0.04 | 1/2 | 0.25 | 2/6 | 1.00 | 1/6 | 0.24 |
Values are mean (Standard Deviation)
aHaemorrhage includes serious bleeding such as GI Bleed or Intracranial Haemorrhage