Skip to main content
. 2016 Mar 23;11(3):e0151372. doi: 10.1371/journal.pone.0151372

Fig 3. Close up of occupancy maps for rare species (model CA1), with planned infrastructure for the canal, including proposed road and dredge fill area (black) [10,28,29].

Fig 3