Skip to main content
. 2016 Apr;137(4):e20153519. doi: 10.1542/peds.2015-3519

TABLE 3.

Analysis of Costs and Cost Effectiveness of PM Intervention

Itema Control Group PM Group
PM stipends—total cost $53 838
PM travel and supplies—total cost $5195
PM training sessions and meetings—total cost $1411.61
Program coordinator salary—total cost $25 350
ED visitsa—total cost $62 730 $60 885
Hospitalizationsb—total cost $81 234 $58 431
ICU staysc—total cost $277 094 $74 742
Wage loss and other costs related to taking care of sick childd—total cost $33 589 $12 985
Total for all costs $454 647 $291 426
ICER per child insurede –$6045.22
ICER per each percent increase in children insurede –$4185.15

Intervention parents (98.4%) experienced a total of 75 missed work days due to their child’s illness. —, N/A.

a

N = 39 ED visits for controls and 40 for the intervention group.

b

N = 2 hospitalizations for controls and 2 for the intervention group.

c

N = 4 ICU stays for controls and 1 for the intervention group.

d

N = 112 control parents (98.2%) experienced a total of 83.5 missed work days due to their child’s illness; N = 121

e

A negative value represents cost savings per year.