Skip to main content
. 2016 Feb 23;16(3):269. doi: 10.3390/s16030269

Figure 9.

Figure 9

The time-domain z-axial vibrational signals at (a) critical point; after 20 min milling; (b) the last point before cutter-breakage after 25 min of milling. The corresponding frequency-domain signals in “milling” status at (c) critical point; after 20 min milling, (d) the last point before cutter-breakage; after 25 min milling.