Skip to main content
. 2016 Mar 9;16(3):349. doi: 10.3390/s16030349

Figure 14.

Figure 14

Figure 14

GUI under different operation regimes: (a) load connection; (b) Increase of load demand; (c) Reduction of load demand; (d) Alarm situation due to hydrogen scarcity.