Skip to main content
. 2016 Mar 31;17:146. doi: 10.1186/s12859-016-0994-9

Table 2.

Sample size and anticipated average power calculated by our method and observed average power by the voom and limma pipeline while controlling FDR using q-value procedure based on parameters at different m for three simulation settings

Simulation 1 Simulation 2 Simulation 3
Our Method Our Method RnaSeqSampleSize Our Method
m Sample Anticipated Observed Sample Anticipated Observed Sample Estimated Sample Anticipated Observed
size power power size power power size power size power power
50 35 0.802 0.858 13 0.810 0.876 9 0.780 22 0.800 0.801
100 34 0.814 0.846 13 0.814 0.876 9 0.724 22 0.803 0.801
200 34 0.815 0.846 13 0.823 0.876 9 0.765 22 0.804 0.801
500 33 0.817 0.833 13 0.827 0.876 9 0.769 22 0.805 0.801
1000 32 0.800 0.804 13 0.826 0.876 9 0.764 22 0.805 0.801

We also present the comparison between our method and RnaSeqSampleSize R package for simulation 2, where the right two columns are sample size and power calculated by the RnaSeqSampleSize R package