Table 3.
Model | ROC AUC |
---|---|
Random Baseline | 0.50 |
Time (t) | 0.53 |
Project (P) | 0.54 |
Donor (D) | 0.72 |
Teacher (T) | 0.55 |
t + P | 0.56 |
t + P + D | 0.73 |
t + P + D + T | 0.74 |
Model | ROC AUC |
---|---|
Random Baseline | 0.50 |
Time (t) | 0.53 |
Project (P) | 0.54 |
Donor (D) | 0.72 |
Teacher (T) | 0.55 |
t + P | 0.56 |
t + P + D | 0.73 |
t + P + D + T | 0.74 |