|
Algorithm 1: Main Procedure of the Proposed Scheme |
|
Input: Reconstruction quality requirement, time of each data gathering period T
|
|
Output: Network sensed data X in epoch Ti
|
| 1 Initiate the network settings, flag = 1 |
| 2 If clock interrupt of Ti is received do
|
| 3 generate feed-back packet and propagate it to the network |
| 4 ΔM measurements are propagated to the sink node through designed routing architecture |
| 5 the sink node receives and adds these projections into projection pool and gets reconstruction result
|
| 6 evaluate
|
| 7 If stopping rule is achieved then |
| 8 flag = 0 |
| 9 Ifend
|
| 10 While flag = 0 |
| 11 Ifend
|
| 12 Return
|