Skip to main content
. 2016 May 23;16(5):748. doi: 10.3390/s16050748

Figure 11.

Figure 11

(a) Details of the cross-sectional instrumentation at mid-span of the beam (dimensions in mm); (b) Picture of the instrumented beam before concrete pouring (adapted from [92]).