Skip to main content
. 2016 May 29;2016:2386596. doi: 10.1155/2016/2386596

Table 5.

Costs under optional calculation scenarios.

Option 1 (million $) Option 2 (million $) Option 3 (million $) (Million $)
AR (gov) 2592.75 NA NA
AR (alt) 3194.74 NA NA
Asthma hosp 1,035.18 1,066.18 1,096.78
Acute bronch hosp 343.06 365.71 363.01

Option 4 (a) (b) (c) (d)

AR (gov) 2,738.08 2,930.38 3,151.71 3992.17
AR (alt) 3340.03 3532.33 3753.66 4756.64
Asthma 1159.76 1248.20 1349.98 1709.97
Acute bronch 476.45 483.26 507.62 575.30