Skip to main content
. Author manuscript; available in PMC: 2017 Jun 1.
Published in final edited form as: Pervasive Mob Comput. 2016 Jun;28:51–68. doi: 10.1016/j.pmcj.2015.09.007

Figure 1.

Figure 1

Example activity distributions calculated at 60 minute time intervals. The figure models three possible activities: sleep, bed toilet transition, and an “other” activity. An activity curve is thus the compilation of all of these activity distributions.