Skip to main content
. 2016 Jun 30;11(6):e0157366. doi: 10.1371/journal.pone.0157366

Table 1. Sampling site characteristics for the Aiguebelette lake, the impoundment and the Tier River downstream from the dam.

Hydrosystem part Aiguebellette Lake Impoundment Tier River
Field station Lake IM1 IM2 R0 R1 R2
Distance from lake outlet (km) - 0.2 1.3 1.7 3.6 6.9
Traditional sampling n = 1 * (29/09 to 03/10/2014) - - - n = 1 ** (30/04/2014) n = 1 ** (13/05/2014)
eDNA sampling n = 3 (29/09/2014) n = 1 (29/09/2014) n = 1 (29/09/2014) n = 3 (25/04/2014) n = 6 (28/04/2014) n = 6 (12/05/2014)
Latitude (WGS94) 45°33’09.2”N 45°32'37.5N 45°32'33.6"N 45°32'34.9"N 45°31’58.3” N 45°31’51.4” N
Longitude (WGS94) 5°47’57.5”E 5°46'26.7"E 5°45'40.4"E 5°45'18.2"E 5°44’35.1”E 5°44’05.3”E
Altitude (m) 375 375 375 370 300 265
Slope (m.km-1) - 3 3 30 33 4
Sampled length (m) - - - 54 120 150
Width (m) - 18 18 2 6.3 6.7
Depth (m) mean = 30 max = 70 1.8 1.8 0.2 0.30 0.32
Discharge (m3.s-1) - 0.171–8.00 0.171–8.00 0.171 0.217 0.441

Sampling effort n, number of eDNA filtrations per number of traditional sampling campaigns (using electrofishing in the river and gillnets in the lake).

*survey sampling.

**complete sampling.