Table 3.
Box 12 (Control) information *.
| Group A | Group B | |
|---|---|---|
| No. of blocks in box | 16 | 16 |
| No. of failed blocks | 2 | 1 |
* Control box was never handled and only measured on Day 30. Group A—Stored onsite and experienced minimal movement. Group B—Subjected to simulated industrial distribution.