Table 6.
Monitoring | Disclosure | Soliciting | Control | |||||
---|---|---|---|---|---|---|---|---|
Estimate (se) | Wald | Estimate (se) | Wald | Estimate (se) | Wald | Estimate (se) | Wald | |
Path a | ||||||||
Low | .08 (.01, .16) | 0.3,p=.98 | .07 (-.07, .21) | -0.5,p=.64 | .10 (.01, .20) | 0.3, p= .79 | .13 (.05, .21) | 1.2, p = .22 |
High | .07 (.01, .15) | .10 (.01, .20) | .09 (.01, .19) | .06 (-.02, .14) | ||||
Path b | ||||||||
Low | .42 (.28, .56) | 1.9, p=.06 | .39 (.25, .53) | 0.8, p=.45 | .44 (.30, .58) | 2.8,p=.005 | .46 (.32, .60) | 2.4,p =.006 |
High | .26 (.12, .40) | .33 (.19, .47) | .23 (.11, .35) | .23 (.11, .35) | ||||