Skip to main content
. 2016 Jul 21;13(7):736. doi: 10.3390/ijerph13070736

Figure 1.

Figure 1

Floor plan of the new daycare center. The additional fan was not installed just after completion, and installed at the tatami room and operated at the measurements after 3 months.