Skip to main content
. 2015 Jan 26;29(2-3):116–136. doi: 10.1002/bdm.1854

Table 1.

tabular image

Note: PT, prospect theory; Priority, priority heuristic; DFT, decision field theory; DbS, decision by sampling; PCS, parallel constraint satisfaction. The ticks and crosses indicate consistent and inconsistent results, and the blue dashes indicate when there is no clear prediction.