Skip to main content
. 2016 Mar 3;3(2):318–327. doi: 10.1080/23328940.2016.1159772

Figure 2.

Figure 2.

Total work completed (kJ) during the 15-min time-trial for Control, Pre-Sago and Dur-Sago Trial. Data are expressed as mean ± SE.