Figure 2.

Total work completed (kJ) during the 15-min time-trial for Control, Pre-Sago and Dur-Sago Trial. Data are expressed as mean ± SE.

Total work completed (kJ) during the 15-min time-trial for Control, Pre-Sago and Dur-Sago Trial. Data are expressed as mean ± SE.