Skip to main content
. 2016 Aug 1;12(8):e1005024. doi: 10.1371/journal.pcbi.1005024

Table 2. Comparison of Grow-shring, IAMB and LBN methods on dataset10.

Method TPR FPR FDR PPV ACC MCC F Runtime(s)
Grow-shring 0.700 0.100 0.533 0.467 0.878 0.506 0.560 128.815
IAMB 0.800 0.075 0.429 0.571 0.911 0.629 0.667 70.524
LBN 0.900 0.050 0.308 0.692 0.944 0.759 0.782 10.462