Table 7.
Operation time of vehicle at the demand points (min).
| i 2 | j 1 | j 2 | j 3 | j 4 | j 5 | j 9 | j 11 | j 13 | k 1 | k 2 |
|---|---|---|---|---|---|---|---|---|---|---|
| Operation time | 32 | 40 | 55 | 15 | 56 | 42 | 25 | 28 | 20 | 19 |
|
| ||||||||||
| i 5 | j 6 | j 7 | j 8 | j 10 | j 12 | k 3 | — | — | — | — |
|
| ||||||||||
| Operation time | 20 | 18 | 17 | 22 | 20 | 19 | — | — | — | — |
Operation time of vehicle at the demand points (min).
| i 2 | j 1 | j 2 | j 3 | j 4 | j 5 | j 9 | j 11 | j 13 | k 1 | k 2 |
|---|---|---|---|---|---|---|---|---|---|---|
| Operation time | 32 | 40 | 55 | 15 | 56 | 42 | 25 | 28 | 20 | 19 |
|
| ||||||||||
| i 5 | j 6 | j 7 | j 8 | j 10 | j 12 | k 3 | — | — | — | — |
|
| ||||||||||
| Operation time | 20 | 18 | 17 | 22 | 20 | 19 | — | — | — | — |