Skip to main content
. 2015 Mar 2;94(3):518–533. doi: 10.3382/ps/peu076

Table 1.

Maintenance schedules of the environmental monitoring instruments for the study.

Instrument Function Maintenance Frequency of
Maintenance
Innova 1412 Gas analyzer (NH3, CO2, CH4, N2O, dew-point temperature) Challenge Weekly
Calibration Reading is 5% off the reference
Chillgard RT O2 analyzer Calibration Weekly
Thermocouple Temperature sensor Calibration Once (start of flock)
Vaisala HMP 61U Relative humidity transmitter Calibration Once (start of flock)
Setra 264 Static pressure sensor Calibration Once (start of flock)
WE100 Barometric pressure sensor Calibration Once (start of flock)
Desiccant H2O removal for O2 analyzer Change Weekly
Heat trace and tape Condensation prevention Temperature check Weekly
Vacuum pump Gas sampling Leakage check Biweekly
Flow check Weekly
Teflon tubing Gas sampling line Leakage check Biweekly
Flow meters Gas sampling line Flow check Weekly
Filter Sample line dust filtration Change Every two months
TEOM PM sampler Filter change Weekly
Clean of cyclone head Weekly
Leakage check Weekly
Flow check Once (start of flock)
Mass transducer calibration constant factor check Once (start of flock)
Pump check Weekly