Skip to main content
. Author manuscript; available in PMC: 2017 Feb 28.
Published in final edited form as: IEEE Access. 2016 Feb 29;4:893–904. doi: 10.1109/ACCESS.2016.2535661

Fig. 5.

Fig. 5

Motion of the perturbation unloaded (blue dashed line) and loaded (red dash-dot line) in the forward direction. Green dashed vertical lines show the time span of the perturbation, roughly 100 ms. Black dashed horizontal lines are the initial and final desired values of the perturbation.