Skip to main content
. 2016 Aug 30;16(1):112. doi: 10.1186/s12874-016-0202-7

Table 13.

Examples of the average cost for time-varying SMART and the standard SMART

c 1 c 2 Average Cost(SD)
Time-varying SMART Standard SMART
Design in Figs. 1 and 3: All the subjects are re-randomized 2 1 3446.5(49.87) 3935.8(41.47)
1 1 2325.7(29.82) 2631.4(19.15)
1 2 3526.5(57.00) 3953.2(46.63)
Design in Figs. 2 and 4: Only non-responders are re-randomized 2 1 3593.4(45.40) 4056.9(36.52)
1 1 2416.1(24.12) 2704.9(14.59)
1 2 3655.5(53.53) 4056.7(42.77)