Table 3.
Total (N = 378) | |
---|---|
Acceptance of at least one project delivered cessation counselling call (%) | |
Yes | 88.6 |
Time till contact post discharge (days) | |
Mean (SD) | 12.4 (29.1) |
Median (IQR) | 3 (7) |
Number of project delivered calls accepted (%) | |
0–3 | 27.0 |
4–7 | 21.4 |
8–11 | 39.4 |
12–15 | 12.2 |
Duration of project delivered calls accepted (min) | |
Mean (SD) | 14.6 (10.7) |
Median (IQR) | 13 (13) |
Used NRT at all during the course of the intervention (%) | |
Yes | 79.1 |
Of those who used NRT (n = 299), type of NRT used (%) | |
Patch only | 7.4 |
Adjunctive only | 17.4 |
Optimal (patch and adjunctive) | 75.3 |
Proportion of completed calls reported using NRT (%) | |
0–25 | 24.1 |
26–49 | 6.1 |
50–74 | 20.4 |
75+ | 49.5 |
Use of Quitline (%) | |
Yes | 10.8 |