Skip to main content
. 2016 Sep 12;11(9):e0162867. doi: 10.1371/journal.pone.0162867

Table 2. Submergence depth and duration of the treatments at different elevations during the three water cycles.

Elevation (m) Submergence depth (m) Submergence duration (d)
From July 2012 to June 2013 From July 2013 to June 2014 From July 2014 to June 2015
165 10 175 158 217
170 5 125 101 141
175 0 2 5 8

The submergence depth refers to the water depth above the soil surface in which saplings of bald cypress and pond cypress were planted. The submergence depth above the top of the saplings varied due to operation of the Three Gorges Dam Reservoir, and can be calculated as the difference between the submergence depth given in this table and the tree height.