Table 2.
Materials | Extraction starting time after the start of mixing | Polymerizing method | ||
---|---|---|---|---|
Initial | Intermediate | After polymerization | ||
Snap | 2 min, 30 sec (SN1) | 5 min (SN2) | 10 min (SN3) | Chemical |
Trim Plus® | 2 min (TR1) | 4 min (TR2) | 8 min (TR3) | Chemical |
Jet | 2 min, 30 sec (JE1) | 5 min (JE2) | 10 min (JE3) | Chemical |
Revotek LC | Unpolymerized (RL1) | 10 s (RL2) | 20 s (RL3) | Light |
Luxatemp Solar | 1 min (LS1) | 4 min (LS2) | 4 min, curing 20 s (LS3) | Dual cure |