Skip to main content
. 2016 Oct 13;6:215. doi: 10.3389/fonc.2016.00215

Figure 2.

Figure 2

Timeline of clinical studies within the MR-linac Consortium. Installation of MR-linacs at all consortium institutes are either ongoing or planned for 2016. Regulatory approval for the integrated MR-linac system is planned for 2017.