Table 8.
Actual and predicted values for RBBR dye degradation.
| Run order | Actual value | Predicted value | Error (%) |
|---|---|---|---|
| 1 | 63.00 | 65.42 | −3.841 |
| 2 | 13.80 | 23.88 | −73.04 |
| 3 | 53.30 | 55.23 | −3.62 |
| 4 | 14.23 | 20.91 | −41.88 |
| 5 | 10.71 | 17.89 | −67.0 |
| 6 | 12.54 | 16.61 | −32.46 |
| 7 | 51.31 | 50.61 | 1.36 |
| 8 | 6.03 | 2.45 | 59.37 |
| 9 | 20.28 | 14.97 | 26.18 |
| 10 | 15.53 | 8.34 | 46.3 |
| 11 | 91.01 | 82.60 | 9.24 |
| 12 | 1.99 | −5.18 | −160.3 |