Environmental Conditions.

Industry/Activity
Ta, °C
RH, %
Pa, HPa
Tg, °C
Tr, °C
v, ms−1
WBGT, °C
Clothing, clo
Agriculture                
Sheep shearing 33.4 (19.0–41.0) 26* 13.2 (9.2–19.1) 37 (20–45) 0.64 (<0.2–1.7) 24.3 (15.9–29.0)
Horse back Mustering 36 Sunny Sunny
Construction                
Carpenters 32.1 (24.0–38.0) (17–36) 12 (35–58) (<0.2–1.2) 25 (19–30) (0.4–0.7)
Laying and tying steel reinforcing 37 55 34 43 2.7 32
Mine construction 37.7 (37.4–38.0) 50 (48–54) 33 (31–35) 1.5 (0.9–2.3) 32 (31–32)
Defense                
5 km march, load 40 kg (24–25)
10 km, 5.5 k·h−1, load 42 kg 24.2 (1.6) 82 24.8 27.3 (5.4) 23 (21–26) 1.37
5 km, load 20 kg, 55 min 27.6
20 km, load 35 kg, 4.0 h 27.1
15 km march (August) 23 (25–16) 19 (17–21)
15 km march (November) 29 (27—31) 75 (59—90) 29 (27—31) 26 (25–28)
Patrol & Recon, load 30 kg 32 48 42 (37—44) (26–28)
Tank crews                
Exterior (June) 31.6 (0.7) 22 (4) 10 28.4 (1.5)
Interior (June) 38.3 (1.3) 29.2 (1.8)
Exterior (September) 36.6 (0.5) 26 (1) 16 33.4 (0.8)
Interior (September) 40.1 (1.8) 32.9 (0.8)
Jungle Patrol                
No body armour, load 21 kg 27 (21–31) 63 (39–97) 23 (17–24)
With body armour, load 29 kg
Emergency services                
Medical emergency resp team 29.3 50 20 Shade Shade Breeze
Search and Rescue                
Heat acclimatized 34.0 (0.7) 48 (2) 25 31.4 (0.5) PPE
Non-heat acclimatized
Prescribed burns                
Day 1 31 (4)
Day 2 33 (6)
Bush fire, fireline constr.                
With fire (F) 29 (19–35) 42* 17 (12–23) 66 (33–96) 1.2 (0.7–1.7) 26 (17–34)
Without fire (NF) 26 (17–33) 4* 16 (12–20) 42 (30–53) 0.8 (0.6–1.0) 22 (15–28)
Maintenance                
Power station maintenance 30 (1) 79 (6) 33 28 (26–29)
Council workers 30 (27–31) 70 (67–79) 30 26 (25–27) (0.64–0.74)
Railway track maintenance                
Day 1 34 (22–41) 15 (11–23) 7.9 (6.1–9.9) 57 (38–70) 2.0 (0.2–3.7) 24 (15–28) 0.5 (0.2–0.9)
Day 2 Max: 31 78–31 28 3.4 17–24
Day 3 Max: 37 13–25 6 3.8 13–25
Electrical utility                
(NT North) 33.7 54 28.2* 32
(NT South) 39.3 9 6.4* 28.7
Mining                
Open cut mine processing 35.1 30 17 31 (2)
Shipping/processing port 31.5 50 23 31 (4)
Surface mine. Blast crew 35.5 (1.3) 24 (6) 16 (14—20) 29.5 (1.9)
Deep mine. 1200—1600 m 36.2 (2.6) 56 33 36.3 (2.8) 1.1 (1.6) 30.8 (2.0)
Machinery operators 33.2 (32.3–33.8) 57 (54–58) 29 (28–30) 4.5 (4.2–4.9) 29 (28–29)
Various 39 (35–42) 21 (15–28) 14 (12–15) 1.0 (0.7–1.6) 27 (26–28)
Light manual work A 35 (2) 59 (6) 33 38.7 (3.6) 4.1 (1.8) 30.6 (2.2)
Light manual work B 37.6 (3.0) 32 (8) 21 43.5 (5.2) 1.8 (1.2) 29 (2)
Others                
Zinc cathode strip 33 (25–39) 30 14.5 (12.5–16.9) 37 (32–41) 1.5 (0.4–2.4) 25 (22–28) 0.8
Lead/zinc process operators 34 (26–37) (21–35) 13 52 (38—65) 0.4 (0.2–0.7) (27–30) (0.8–0.9)