Skip to main content
. 2016 Oct 26;11(10):e0155734. doi: 10.1371/journal.pone.0155734

Fig 4. Annual cost ($US) with 90-90-90 and 90-90-75 ART scenarios, with and without scaling up VMMC.

Fig 4

Cost shown is the annual combined cost of providing VMMC and ART.