Skip to main content
. 2016 Sep-Oct;24(5):437–446. doi: 10.1590/1678-775720150600

Table 1. Percentage of voids/gaps per cement according to application technique.

Manufacturer's instructions Application using Centrix syringe
ARC 3.5 (2.0)bA 0.7 (1.1)bB
U200 7.4 (3.9)aA 0.9 (1.5)abB
MAX 3.6 (2.4)bA 0.4 (0.4)bB
CSA 3.8 (2.4)bA 3.2 (3.9)aA

In parenthesis: standard deviation (n=5)

Different letters, uppercase for columns, lowercase for rows: significant (p<0.05)