Table 1.

Classification scheme for economic evaluations (Drummond 2005).

Are both Costs (Inputs) and Consequences (Outputs) of the Alternative Examined?
Are two or more alternatives compared? No No Yes
Examine consequences only Examine only costs
1B PARTIAL EVALUATION 1B 2 PARTIAL EVALUATION
Outcome Description Cost description Cost-outcome description
Yes 3A PARTIAL EVALUATION 3B 4 FULL ECONOMIC EVALUATION
Efficacy effectiveness evaluation (e.g., RCT) Cost analysis Cost effectiveness analysis
Cost Utility analysis
Cost benefit analysis