Table 1.
Scheme | Message Overhead | Time Overhead |
---|---|---|
ICV-MIMO | O(Nnei) | max{O(Tt), O(Nnei·Tr)} |
CMIMO | O(Ndeg) | max{O(Tt), O(Ndeg·Tr)} |
Scheme | Message Overhead | Time Overhead |
---|---|---|
ICV-MIMO | O(Nnei) | max{O(Tt), O(Nnei·Tr)} |
CMIMO | O(Ndeg) | max{O(Tt), O(Ndeg·Tr)} |