Skip to main content
. 2010 Oct 13;2(3):129–133. doi: 10.5114/jcb.2010.16924

Table 2.

Mean deviation, standard deviation (1sd), and maximum difference observed between the TPS calculations and the verification program

Application N° cases Difference (%)
Mean Standard deviation Maximum difference
HDR-PDR 95 –0.22 0.48 –1.93
LDR 155 0.17 0.07 0.42