Skip to main content
. 2016 Nov 24;48:90. doi: 10.1186/s12711-016-0264-3

Fig. 3.

Fig. 3

SICCT and test date predicted values. Fitted cubic smoothing spline for the predicted value for dc from the ASReml analysis for 100 knot points. Left against age, right against test date (tdate). The 10 and 90% of the data distribution are also shown