Skip to main content
. 2016 Nov 14;6(11):e013728. doi: 10.1136/bmjopen-2016-013728

FigureĀ 2.

FigureĀ 2

The cumulative probability of participation in days after mailing of either an invitation with a scheduled screening appointment (blue) or standard open reminder letter (red) with pointwise 95% CIs indicated.