Skip to main content
. 2016 Dec 9;11(12):e0167823. doi: 10.1371/journal.pone.0167823

Fig 3. Assessment of methodological risk of bias for the reliability studies taken together.

Fig 3

Green indicates a low risk of bias, yellow an unclear risk of bias and red a high risk. Grey indicates non-applicable items. For the overall assessment of bias, purple indicates major doubt as to the overall risk of bias.