Skip to main content
. 2016 Dec 16;11(12):e0168081. doi: 10.1371/journal.pone.0168081

Table 4. Results of the examination of the forest plots (p value).

Six months versus Baseline (p value) SMILE versus FS-LASIK (p value)
The SMILE group The FS-LASIK group Baseline One week post-surgery One month post-surgery Three months post-surgery Six months post-surgery
TBUT 0.42 0.07 0.50 0.51 0.04 < 0.0001 0.02
SIT 0.02 < 0.00001 0.42 0.20 0.57 0.19 0.62
OSDI 0.79 < 0.00001 0.53 < 0.00001 < 0.00001 0.006
TFO 0.41 0.46

TBUT, tear breakup time; SIT, Schirmer’s I test; OSDI, ocular surface disease index; TFO, tear film osmolarity.

p < 0.05.