Skip to main content
. 2016 Dec 22;4:e2775. doi: 10.7717/peerj.2775

Table 1. Hub-bottleneck identification.

Cut-off determination for hubs & number of hubs and bottlenecks.

Mean (M) Standard Deviation (S.D) Cut-off (M + 2*S.D) Number of hubs Number of bottlenecks
CSF 4.86 7.3 19.4 56 72
PBMCs 3.89 6.06 16.01 20 25