Skip to main content
. Author manuscript; available in PMC: 2017 Jan 3.
Published in final edited form as: J Chem Theory Comput. 2014 Mar 3;10(4):1361–1365. doi: 10.1021/ct500050p

Table 1.

Timings for Different Water Boxes with GEM* Model 1 (All Times in Seconds)

number of waters all compact PME with 2 diffuse hermites FFP with 2 diffuse hermites
216 100.04 127.12a,b 266.84a
512 220.86 239.70a,b 373.48a
1024 457.99 495.29a,b 682.31a
2048 1172.43 1177.05a,b 1368.90a
4096 3319.59 3197.51c 4180.62d
a

FFT grid = 843.

b

B-spline order =10.

c

FFT grid = 923, B-spline order = 12.

d

FFT grid = 100.