Table 1.
Maintenance Strategy Characteristics
Maintenance Strategy | Reactive Maintenance (RM) | Preventive Maintenance (PM) | Predictive Maintenance (PdM) | Proactive Maintenance (PaM) |
---|---|---|---|---|
Maintenance Interval | Fail-and-fix | Time based; Usage based | Reliability based; Condition based | Improve & sustain |
|
||||
Object | Component; Sub-system; System | Component; Sub-system; System | Component; Function; System | Component; Function; System |
|
||||
Planning & Scheduling | Planning on the fly | Planning & scheduling based on ideal PM interval | Predictive planning & scheduling | Proactive planning & scheduling |
|
||||
Human Factors (inspection & decision-making) | Medium to High | Intermediate | Low | Low (false alarm) |
|
||||
Cost Effectiveness | Labor intensive; Labor and material | Costly due to over maintenance or ineffective & inefficient PM | Cost-effective; extended life & less failure- induced costs | Cost-effective: Substantially save failures & extend the life of equipment |
|
||||
Requirement for Technology Readiness | Low | Low to Medium | High | High |