Figure 3.
Effects of DmRHAU on G4-15T in the presence of ADP·AlF. Representative time trace of extension change of a G4-15T tether at 54 pN obtained in force-jump cycles of 1 pN (60 s) to 54 pN (30 s) before (left) and after (right) introduction of DmRHAU and ADP·AlF
. Unfolding events are indicated by arrows.