Table 1.
P | Method | Mean iter ±std | Mean evals ±std | Mean time ±std(s) | Speedup |
---|---|---|---|---|---|
10-eSS | 80 ±30 | 199214 ±44836 | 5378±1070 | - | |
CeSS (τ=700s) | 109 ±49 | 188131 ±82834 | 6487±3226 | 0.83 | |
B1 | CeSS (τ=1400s) | 122 ±41 | 175331 ±98255 | 5018±1477 | 1.07 |
saCeSS(non-adaptive) | 92 ±35 | 143145 ±61828 | 3759±976 | 1.43 | |
saCeSS | 62 ±21 | 92122 ±35058 | 2753±955 | 1.95 | |
10-eSS | 450 ±167 | 1504503 ±541257 | 1914±714 | - | |
CeSS (τ=400s) | 452 ±278 | 1637125 ±1016688 | 2459±2705 | 0.78 | |
B2 | CeSS (τ=800s) | 508 ±205 | 1802917 ±690613 | 1911±1103 | 1.00 |
saCeSS(non-adaptive) | 440 ±192 | 1528793 ±647677 | 1918±833 | 1.00 | |
saCeSS | 846 ±982 | 1247699 ±1222378 | 1694±1677 | 1.13 | |
10-eSS | 10062 ±2528 | 66915128 ±15623835 | 511166±135988 | - | |
CeSS(τ=50000s) | 7288 ±5551 | 52592578 ±35513874 | 332721±245829 | 1.53 | |
B3 | saCeSS(non-adaptive) | 4323 ±3251 | 32604331 ±23357322 | 251305±209082 | 2.03 |
saCeSS | 4113 ±3130 | 27647470 ±21488783 | 229888±238970 | 2.22 | |
10-eSS | 99 ±121 | 2230089 ±2068300 | 750±692 | - | |
CeSS (τ=100s) | 140 ±386 | 1665954 ±2921838 | 817±1909 | 0.92 | |
B4 | CeSS (τ=200s) | 119 ±87 | 1649723 ±1024833 | 518±428 | 1.45 |
saCeSS(non-adaptive) | 39 ±30 | 1163458 ±927751 | 402±303 | 1.86 | |
saCeSS | 35 ±24 | 1017956 ±728328 | 343±240 | 2.18 | |
10-eSS | 16 ±4 | 69448 ±14570 | 901±197 | - | |
CeSS (τ=200s) | 11 ±4 | 108481 ±36190 | 1481±634 | 0.61 | |
B5 | CeSS (τ=400s) | 14 ±3 | 94963 ±20172 | 996±264 | 0.90 |
saCeSS(non-adaptive) | 10 ±2 | 49622 ±9530 | 637±131 | 1.42 | |
saCeSS | 10 ±3 | 51076 ±12696 | 658±174 | 1.37 | |
10-eSS | 4659 ±3742 | 9783720 ±8755231 | 8217±7536 | - | |
CeSS (τ=1000s) | 5919 ±5079 | 10475485 ±8978383 | 8109±7441 | 1.01 | |
B6 | CeSS (τ=2000s) | 6108 ±6850 | 10778260 ±12157617 | 7878±9400 | 1.04 |
saCeSS(non-adaptive) | 2501 ±1517 | 4394243 ±2689489 | 3638±2302 | 2.26 | |
saCeSS | 1500 ±1265 | 2594741 ±2214235 | 2177±1933 | 3.77 |
Execution time and speedup results using 10 processors. Stopping criteria: VTR B1=1.3753×104, VTR B2=2.50×102, VTR B3=3.7×10−1, VTR B4=55, VTR B5=4.2×103, VTR B6=1.0833×105