Skip to main content
. 2017 Jan 19;2017:5362704. doi: 10.1155/2017/5362704

Table 1.

Univariable binary regression of circadian risk development for binary output variables. Shown are the results of univariable regression analyses of the circadian risk development per 3-hour day and night shift intervals for the investigated endpoints hospital discharge on dialysis [Yes/No], delayed graft function [Yes/No], early postoperative graft loss [Yes/No], postoperative graft loss due to surgical reasons [Yes/No], and reoperation [Yes/No]. Values of calculated odds ratios of each time interval were plotted on radar-plots to visualize the circadian risk developments of each investigated endpoint.

3 h interval No Yes % Univariable binary regression χ 2 Circadian risk development
n = 1044 n = 218 p OR 95% CI

Reoperation 12 AM–3 AM (n = 96) 81 15 15.6 0.657 0.878 0.496–1.555 0.653 graphic file with name JTRANS2017-5362704.tab1.i001.jpg
3 AM–6 AM (n = 25) 17 8 32 0.056 2.301 0.980–5.402 0.070
6 AM–9 AM (n = 134) 117 17 12.7 0.140 0.670 0.394–1.140 0.124
9 AM–12 PM (n = 267) 229 38 14.2 0.140 0.751 0.514–1.098 0.131
12 AM–3 PM (n = 274) 226 48 17.5 0.904 1.022 0.718–1.454 0.904
3 PM–6 PM (n = 169) 136 33 19.5 0.406 1.191 0.789–1.798 0.412
6 PM–9 PM (n = 157) 133 24 15.3 0.482 0.847 0.534–1.344 0.475
9 PM–12 AM (n = 140) 105 35 25.0 0.011 1.710 1.131–2.588 0.014

3 h interval No Yes % Univariable binary regression χ 2 Circadian risk development
n = 1207 n = 55 p OR 95% CI

Perioperative graft loss 12 AM–3 AM (n = 96) 94 2 2.1 0.269 0.447 0.107–1.862 0.211 graphic file with name JTRANS2017-5362704.tab1.i002.jpg
3 AM–6 AM (n = 25) 21 4 16.0 0.008 4.430 1.467–13.38 0.024
6 AM–9 AM (n = 134) 129 5 3.7 0.707 0.836 0.327–2.133 0.701
9 AM–12 PM (n = 267) 259 8 3.0 0.224 0.623 0.291–1.335 0.200
12 PM–3 PM (n = 274) 262 12 4.4 0.984 1.007 0.523–1.937 0.984
3 PM–6 PM (n = 169) 159 10 5.9 0.289 1.465 0.724–2.965 0.307
6 PM–9 PM (n = 157) 151 6 3.8 0.725 0.856 0.361–2.033 0.720
9 PM–12 AM (n = 140) 132 8 5.7 0.407 1.386 0.641–2.997 0.423

3 h interval No Yes % Univariable binary regression χ 2 Circadian risk development
n = 1241 n = 21 p OR 95% CI

Perioperative graft loss due to surgical reasons 12 AM–3 AM (n = 96) 95 1 1 0.616 0.597 0.079–4.496 0.588 graphic file with name JTRANS2017-5362704.tab1.i003.jpg
3 AM–6 AM (n = 25) 22 3 12 0.001 9.242 2.537–33.67 0.007
6 AM–9 AM (n = 134) 131 3 2.2 0.583 1.413 0.411–4.863 0.598
9 AM–12 PM (n = 267) 265 2 0.7 0.205 0.388 0.090–1.677 0.151
12 PM–3 PM (n = 274) 269 5 1.8 0.813 1.130 0.410–3.113 0.815
3 PM–6 PM (n = 169) 166 3 1.8 0.902 1.080 0.315–3.708 0.903
6 PM–9 PM (n = 157) 157 0 0 0.996 0.000 0.000 0.018
9 PM–12 AM (n = 140) 136 4 2.9 0.249 1.913 0.635–5.769 0.281

3 h interval No Yes % Univariable binary regression χ 2 Circadian risk development
n = 601 n = 261 p OR 95% CI

Delayed graft function 12 AM–3 AM (n = 73) 48 25 34.2 0.441 1.220 0.735–2.026 0.445 graphic file with name JTRANS2017-5362704.tab1.i004.jpg
3 AM–6 AM (n = 15) 12 3 20.0 0.388 0.571 0.160–2.040 0.364
6 AM–9 AM (n = 99) 68 31 31.3 0.812 1.056 0.672–1.660 0.812
9 AM–12 PM (n = 186) 137 49 26.3 0.188 0.783 0.544–1.127 0.183
12 PM–3 PM (n = 181) 121 60 33.1 0.345 1.184 0.834–1.681 0.347
3 PM–6 PM (n = 112) 82 30 26.8 0.389 0.822 0.526–1.284 0.384
6 PM–9 PM (n = 105) 76 29 27.6 0.527 0.863 0.548–1.361 0.524
9 PM–12 AM (n = 91) 57 34 37.4 0.121 1.429 0.910–2.246 0.126

3 h interval No Yes % Univariable binary regression χ 2 Circadian risk development
n = 862 n = 102 p OR 95% CI

Discharge on dialysis 12 AM–3 AM (n = 77) 73 4 5.1 0.119 0.441 0.158–1.233 0.081 graphic file with name JTRANS2017-5362704.tab1.i005.jpg
3 AM–6 AM (n = 19) 15 4 21.1 0.145 2.305 0.750–7.082 0.178
6 AM–9 AM (n = 114) 99 15 13.2 0.342 1.329 0.739–2.389 0.354
9 AM–12 PM (n = 207) 186 21 10.1 0.818 0.942 0.568–1.564 0.817
12 PM–3 PM (n = 200) 181 19 9.5 0.577 0.861 0.510–1.456 0.572
3 PM–6 PM (n = 127) 112 15 11.8 0.629 1.155 0.645–2.068 0.633
6 PM–9 PM (n = 114) 105 9 7.9 0.323 0.698 0.342–1.425 0.303
9 PM–12 AM (n = 106) 91 15 14.2 0.208 1.461 0.810–2.634 0.223